Elmbridge Rugby Club – Improvement for the pitches

Thames Materials won the contract to improve the rugby pitches at Elmbridge. The site was constantly flooding, making it unusable for large parts of the season.

Thames Materials have stripped all topsoil and have undertaken a project to import soil and stone from suitable construction sites to improve the sub layer of the site along with improving all drainage across the pitches. Work is likely to be completed by the summer of 2019.

ENQUIRY FORM