Thames Material secured the rights to provide suitable construction material under CLAIRE to complete a project to improve the drainage and conditions of the ground on the Driving Range at Wycombe Heights. The project involved stripping of all topsoil and reinstatement once completed with additional seeding as required. This project was completed in Oct 2018.